Metal siding accessories metal soffit accessories vinyl siding vinyl siding accessories vinyl soffit accessories vinyl siding blocks.
Horizontal siding on steep slope.
On a horizontal surface all compactive energy is used for it s intended purpose soil compaction.
The most common human alterations that contribute to landsliding.
Slope a roof s slope is the number of inches it rises for every 12 inches of horizontal run a roof with a 4 in 12 slope rises 4 inches for every 12 inches of horizontal run.
Ceilings product comparison tool.
A comprehensive roofing specification writing tool allowing users to quickly write accurate steep and low slope roofing specifications for job submittal packages.
On a sloped surface some of the compactive energy is directed parallel to the sloped surface.
Remaining energy that is perpendicular to sloped surface is reduced a little but that is usually minor compared to the disruptive sideways component.
Stormwater and steep slopes.
Use j channel to receive vertical siding.
Typical horizontal directional and vertical drain sketch july 1999 shannon wilson.
Shannon and wilson landslide study for the city of seattle 2000 landslides in seattle.
In our case the total rise was 29 in.
Dividing by 6 yielded 4 83 which we rounded up to 5 risers.
Drill minimum 3 16 4 8mm diameter weep holes in the bottom of the j channel no more than 24 610mm apart.
Horizontal scale 90 deg reading in inches 1 shed roof horizontal scale left slope reading in inches 1 2 gable roof range of roof slope rise run range of roof pitch in degrees tangent value roof pitch rise run percent grade 24 in 12 very steep to 3 in 12 almost flat 63 3 deg to 14 deg.
See more ideas about house design architecture architecture design.
Subtract 1 from the number of risers to determine the number of treads.
If horizontal siding is used a j channel or starter strip must be used.
2 11 directional drill drain vertical drain slide scarp failure.
For shallow slopes up to a maximum of 8 in.
Typical range of roof slope values.
If starter strip is used it is necessary to provide at least 3 8 9 5mm clearance for proper engagement of the siding.
2 00 to 0 25.
Jul 31 2019 explore robert dietz s board steep slope houses followed by 172 people on pinterest.
The terms pitch and slope are simply two different ways of expressing the same measurement.
Divide the total rise by about 6 in.