Soffit and fascia starting with the soffit nail lengths of j channel against the inner edge of the fascia board.
How do you layout vinyl siding.
Count your way down to benchmark where the starter strip will go.
When installing in temperatures below 40 degrees f increase minimum clearance to 3 8 9 5mm.
Vinyl siding comes in many shapes sizes and colors to help you design the perfect look for your project.
Vinyl siding installation on a dreamspaces shed.
Begin at the windows.
Leave a minimum of 1 4 6 4mm clearance at all openings and stops.
Keep in mind that most vinyl siding profiles are intended to emulate the look of traditional wood siding products.
The bottom of the starter strip the part the bottom panel hooks on to should be at least 1 in.
Vinyl siding can be installed over common wood sheathings such as plywood oriented strand board osb or other materials e g foam plastic insulating sheathing.
Some manufacturers of vinyl siding do not recommend the use of drop in backers with certain vinyl siding configurations.
Below the top of the foundation but the lower the vinyl siding is installed the better.
Installing vinyl siding in these 23 steps step 1.
Soffit and fascia if the soffit on your home wraps around a corner as with a hip roof you ll need to make some.
Snap a line around the house signifying the top of the strip and then put the strip on the line and nail it.
It is one of the most versatile siding products on the market today.